Trump Is Heading to Arizona to Break Ground on TSMC’s Newest Chip Plant

Published November 27, 2026, 10:48am ET · 3 min read

This post may contain links from our sponsors and affiliates, and Flywheel Publishing may receive compensation for actions taken through them.

President Donald Trump speaks at a White House
© Shutterstock

President Donald Trump will travel to Arizona on Friday, December 4, 2026, to speak as construction begins on a new Taiwan Semiconductor Manufacturing (NYSE:TSM | TSM Price Prediction) foundry in the Phoenix area. The ceremony marks the start of construction on the fifth phase of TSMC’s Arizona expansion. A company representative confirmed it on November 25, after a White House official announced the trip.

The stock barely responded. The ADR (the U.S.-traded receipt for TSMC’s Taiwan shares) closed November 25 at $342.34, then rose to $347.40 in after-hours trading, up 1.48%. In Taipei on November 27, the shares reached 2,175 Taiwan dollars, up 1.4% from 2,145.

TSM price target

That bounce came in the middle of a hard month. Through November 25, the ADR was down 15.71% from its October 30 close of $406.13. That puts it on track for its worst month since September 2022, when it fell 17.74%.

What the December 4 Groundbreaking Commits TSMC To

Only three things are confirmed: the date, the site, and the start of construction, and TSMC has not published a node, capacity, cost, or production date for the fifth phase.

The money traces to an earlier announcement. In July, TSMC announced an additional $100 billion U.S. manufacturing commitment, bringing its total pledged U.S. chipmaking investment at that time to $265 billion. The administration linked that dated, multiyear promise to the U.S.-Taiwan trade agreement.

Korean press reports say TSMC’s official Arizona plan covers 6 logic wafer fabs, 2 advanced packaging facilities and an R&D center. The White House says the expansion will create 10,000 direct jobs and 11,000 indirect jobs. It also says the site already supports more than 12,000 construction jobs.

How Much Arizona Moves TSMC’s Numbers

TSMC makes chips in Arizona for Nvidia (NASDAQ:NVDA) and four other large U.S. chip designers. On the October 15 call, Chief Executive C.C. Wei said: “most of our large customers are in the U.S., and they request that TSMC increase capacity.”[1]

A new phase won’t change the near-term numbers much. Third-quarter revenue was $46.72 billion[2] and fourth-quarter guidance is $52.3 billion to $54.3 billion. The second Arizona fab won’t begin volume production until the third quarter of 2027[1].

The cost shows up in margins. On the same call, the chief financial officer said dilution from overseas fabs should extend to 3% to 4%[1] in the next few years as more U.S. fabs ramp up.

How Washington Politics Help and Hurt TSMC

TSMC began building in Arizona under President Joe Biden, with support from the bipartisan CHIPS and Science Act. Trump presents the investment as a result of his tariffs, which gives TSMC political cover but also links the company to one administration’s trade policy.

Arizona Democrats have raised national security and corruption concerns about Trump’s involvement with Nvidia, and a local report stated: “Trump owns stock in Nvidia.” Nvidia CEO Jensen Huang is scheduled to testify before the Senate Banking Committee on chip sales abroad on December 3. Any tighter export rules would hit TSMC’s largest customers.

On November 24, a TSMC unit reportedly asked Texas to cap property taxes on a proposed $22.6 billion plant. TSMC has not committed to that plant. Packaging facilities in the U.S. would let AI chips be both made and finished outside Taiwan.

Where TSMC Stock Stands After the November Selloff

The November slip follows a broad selloff in AI and chip stocks that was already underway before the Arizona news. The ADR is 29.5% below its October 5 closing high of $485.80. Its 52-week range runs from $273.08 to $487.47, and the company is valued at $1.77 trillion.

TSM price scenario

Management says demand still outpaces capacity. Wei said, “we still think demand is higher than supply,”[1] and the 2026 capital budget of $60 billion to $64 billion is the spending meant to turn that shortfall into revenue.

TSMC’s competitive position rests on the fact that every major AI chip designer relies on its leading-edge fabs, and while higher Arizona costs and Washington politics will trim returns, TSMC remains the company that makes the chips.

TSM analyst ratings

The first test comes on December 4. If TSMC files a disclosure after the ceremony that names a node or capacity for the fifth phase, the expansion becomes measurable. If the ADR instead closes below its $273.08 52-week low, the case for the Arizona expansion paying off looks much weaker.

Contact [email protected] for any questions or corrections.

Omor Ibne Ehsan

Omor Ibne Ehsan is a writer at 24/7 Wall St. He is a self-taught investor with a focus on growth, cyclical, and dividend equities that have strong fundamentals, value, and long-term potential. He also has an interest in high-risk, high-reward investments such as penny stocks.

All articles →

Sources

  1. Taiwan Semiconductor Manufacturing Company Ltd. Q3 2026 earnings callTaiwan Semiconductor Manufacturing Company Ltd.
  2. Taiwan Semiconductor Manufacturing Form 6-K (Q3 FY2026)U.S. Securities and Exchange Commission